Saturday, 25 July 2015

Stratford-on-Avon-Canal

Saturday 25 July, 11 miles, 1 Draw bridge.

The promise of a rain free day was thwarted with a couple of showers in the morning. Moved off the mooring at 1100 and after a many point turn got the boat turned and then moved 50 yds to fill up with water. Probably the lowest pressure we have struck. There is a sign in the shower that says hot water is not available when a boat is taking on water due to low pressure. In the 45 minutes it took to fill the tank I managed to wash the side of the boat. We left Birmingham slowly as the run down past Gas street is worth absorbing. Just a nice place to be. Then we headed south towards Worcester before turning east on to the Stratford-on-Avon Canal. At this point we are still in Birmingham and not the best place to moor. We travel on and get a pump out at a boatyard who advise we should go past bridge 8 before stopping. Soon after bridge 8 we are into a cutting with overhanging trees which make it a bit dark. At the first bit of canal with no trees overhead we moor up between bridge 11 & 12 for the night.

No comments:

Post a Comment